The redevelopment of the former Police Station transforms the site into a high-quality residential development while preserving its historical character. The scheme includes:
Block A (Existing Police Station Building) – Front façade Retention and refurbished corner building with rear extensions and loft conversions to create six terraced houses and four flats.
Block B (Tottenham Lane) – A newly constructed building comprising seven flats and four mews houses.
Block C (Glebe Road & Harold Road) – A new block providing eight contemporary flats.
Landscaping & Associated Works – Enhancing communal spaces and integrating the development into its surroundings.
Sustainability Features
The development prioritises sustainability with Mechanical Ventilation with Heat Recovery (MVHR), Air Source Heat Pumps (ASHP), and Solar Photovoltaic Panels (Solar PV) to reduce carbon emissions. A high-performance building fabric ensures excellent insulation and energy efficiency, creating comfortable, low-energy homes
Completion March 2026
Project value: £ 8.5 million
Time to build: 78 weeks